There is no single "right" 6kW setup
Seven years of handling residential solar orders in northern Illinois, and I've personally made—and documented—more sizing mistakes than I'd like to admit. Maybe 14 significant ones. Maybe 12, I'd have to check the log my former PM kept. Between them, roughly $18,000 in rework, two missed install windows, and one customer relationship that took a genuinely painful year to repair.
So when somebody asks me "what size inverter do I need" or "how many miles per hour does a Level 2 charger actually add," I don't give them one answer. Because the honest answer depends entirely on which scenario they're in.
What follows is how I'd size things today. It's drawn from mistakes, not from a datasheet. If you want the datasheet version, GoodWe publishes specs for the 6kW class of inverters directly—go read those. This is the stuff the datasheet assumes you already know.
Scenario A: Solar now, EV later
This is the most common one I get, and it's the one I've botched most often.
Here's my canonical mistake. In late 2022 I quoted a GoodWe 6kW system for a 1,900-square-foot home outside Naperville. The homeowner told me—clearly, in writing—"no EV planned, we're keeping both gas cars." I sized for their existing load. I ran the numbers, they came out clean, and the 6kW unit fit the consumption profile almost exactly. That part was correct.
Six months later they bought a Model Y.
Sizing isn't purely arithmetic on panel count and historical kWh. What I mean is: the number that matters is the load profile over the next decade, not the last twelve months. The GoodWe inverter did exactly what I asked it to do. The problem was my definition of "what to ask."
My current rule: if an EV purchase is realistically within three years—even "probably not"—I oversize the inverter by 20% and design the panel schedule for a future dedicated 240V circuit regardless. The cost difference at install is modest. The retro-fit cost later is not.
Illinois wrinkles this further. ComEd and Ameren net-metering terms have shifted over the past several years, and the economics of oversizing in Illinois aren't the same as in, say, Arizona. In 2025 the state still runs the Adjustable Block Program and Illinois Solar for All, but the credit values move. Don't plan the size purely around an SREC number you saw last quarter—verify it against the current Illinois Power Agency portal.
As for the level-of-service question customers ask in this scenario: according to the U.S. Department of Energy's Alternative Fuels Data Center, a Level 2 charger adds roughly 10 to 25 miles of range per hour, depending on vehicle efficiency and amperage. A 40A charger on a typical sedan is closer to the low end; a 48A charger on an efficient SUV is closer to the middle. Full overnight charge is typically 6 to 10 hours.
Scenario B: Solar and EV together
Logistically harder to schedule. Electrically, easier to spec right.
When I compared a paired install I oversaw in 2023 (solar + EV charger at the same time) against a retrofit I inherited in 2024 (solar first, charger added fifteen months later), the difference wasn't just cost. The paired install used one continuous conduit run and one panel upgrade. The retrofit used two, because we couldn't get the customer to open the drywall a second time. Seeing both confirmed what the senior electrician had been telling me for years: the labor is the expensive part, not the copper.
For a 6kW GoodWe system running both home load and an EV, the sizing question changes shape. You're no longer solving for annual consumption; you're solving for peak simultaneous load. If the customer works from home and charges their car at midday, the inverter output is doing double duty. If they charge overnight, the inverter doesn't need to cover both—the grid does—but net metering economics shift in ways I'd rather not hand-wave.
My current checklist for this scenario:
- Add 25% headroom on the inverter sizing versus the non-EV baseline.
- Spec the EV circuit at 48A if the panel supports it, not 32A. The labor is the same; the future-proofing isn't.
- Confirm the panel has capacity for a 60A breaker without a service upgrade before you sign the contract.
(Should mention: I learned this checklist after installing a charger on a 100A panel that turned out to need a service upgrade anyway. That mistake cost the customer $2,400 and me a referral.)
To be fair, there's a case for smaller chargers if the customer's daily driving is under 30 miles. A 32A charger handles that charging overnight without thinking. But I've stopped offering that as the default because the "we don't drive much" assumption has a bad track record in my notebooks.
Scenario C: EV first, solar later
This is where I wish more installers thought twelve months ahead.
When a customer is installing a Level 2 charger now and wants solar next year—or the year after that, once they've saved—the temptation is to spec the charger as a standalone job. That's fine for the charger. It's not fine for the future solar, because the panel schedule and the conduit path you commit to today are the ones the solar installer inherits tomorrow.
What I'd do differently, if I could redo the 2021 jobs: run the conduit for future solar during the charger install. It adds a modest amount to the electrical scope. It saves an order of magnitude on the solar install later. Granted, it requires the customer to believe they'll still want solar in a year—but if they're calling me about a Level 2 charger, they're already halfway there on energy.
On charging speed: I'm not an electrician, so I won't go deep into the NEC continuous-load math for a specific panel. What I can tell you from a project-management angle is that the reported charging time—"how long does a Level 2 charger take"—is the question customers ask, but the question they actually care about is "will this cover my commute." In my experience, roughly 80% of our residential customers commute under 40 miles a day, which is one to three hours of Level 2 charging. That's a much cheaper answer than a full overnight recharge every night.
The GoodWe ecosystem argument shows up here more than anywhere else. If the customer already has a GoodWe inverter or is planning one, the EV charger options that integrate with the monitoring app and can be scheduled around solar production genuinely shift the cost math. They're not the only option in that space, but if you're building around the brand anyway, it's worth factoring in.
How to tell which scenario you're in
Run through these in order. First: do you own an EV today? If yes, you're in Scenario C or possibly B. If no, go to the next question.
Second: is an EV likely within three years? If yes, you're in Scenario A, and the answer is to size as if the EV is arriving next summer. If no, size to current load and revisit in five years—but not before.
Third: is the panel at 150A or above? If yes, Scenario B is cleanly feasible. If no, Scenario C might actually be the better first move—get the service upgraded as part of the charger install, and you'll have a panel ready for solar when budget allows.
What I'd tell the next person
I'm not a licensed electrician or a tax advisor, so I can't speak to specific NEC interpretation or exact SREC valuation for your address. Those get into code-compliance and tax-credit territory, which is beyond my lane. What I can tell you from a project-management perspective is this: the sizing mistake I see most often isn't picking the wrong inverter. It's picking the right inverter for the wrong five years.
This sizing logic was accurate as of early 2025. GoodWe's 6kW-class lineup and the Illinois net-metering framework both evolve, so verify current datasheets and incentive levels before locking a quote. If your GoodWe inverter reviews search is pulling up one-star gripes about a specific feature, check whether that feature is actually relevant to the scenario you're in—reviews are noisy, and about half of what I read on recent GoodWe inverter reviews was actually about the installer, not the equipment.
Pick the scenario first. Buy the hardware second.